Table of contents

Completed Jobs

Last modified
Table of contents
<< PrevNext >>

All jobs that have been defined through a policy and are not currently under execution will have their next iteration displayed in the Scheduled Jobs list. Once the jobs become current, they automatically move from the scheduled list to the running list, and the next iteration will be displayed in the scheduled list.

 

Jobs2.png

 

The result pane displays the following columns:

  • Name - defines the scheduled operation and the volume group involved.
  • Next Run - indicates the date and time of the next scheduled iteration.
  • Last Run - indicates the date and time of the last run scheduled iteration.

 

Note.png Note: You might see some scheduled backup runs missing from this list if the previous run is still in progress. In other words, if a backup job takes long enough to spill into the next run, the next run is skipped and will not be visible in the scheduled list in the Results Pane.

 

Back to Top

 

<< PrevNext >>
Page statistics
330 view(s) and 3 edit(s)
Social share
Share this page?

Tags

This page has no custom tags.
This page has no classifications.

Comments

You must to post a comment.

Attachments